How to operate the PTFE-PES membrane pleats middle seam welding machine?

Views : 4640
Author : indrofiltermachine.com
Update time : 2020-05-12 13:31:04
How to operate the PTFE-PES membrane pleats middle seam welding machine?
Once you have completed the debugging, you are ready to run your device normally as follows:
1. Insert the pleats into the gap from either end correctly, then push all pleats along with dies direction, till pleats go through the whole gap, step on the pedal switch with your foot for very short time, (note: do not press so long time, several seconds is ok), pleats seam will be welded once automatically.
2. After welding finished, cold air begin to blow to make mould temperature drop; when the temperature drop to the pre-set temperature(moulds opening temperature), mould will open.
3. Take out the welded pleats.
4. Repeat the above steps to get into normal production
5. If you need to weld different filter pleats, please follow the above steps to do debugging, then start running normally.